Number: 21-05
Good practice in relation to the use and storage of eye protection developed as a result of a minor incident on a members vessel.
View AlertNumber: 17-14
The injured party was in the process of manufacturing a metal blank for a pipe on the vessels hot water system, the pipe was to be manufactured using a piece of 2mm metal plate. Part of the process
View AlertNumber: 17-11
Whilst operating the forward utility hoist (Tugger), weight was taken to support a 1.5t basket to assist the crane in removing the basket from the drill floor. The winch wire was in tension and load 2” above the
View AlertNumber: 17-08
An experienced engineer was changing out a drill bit on a tower drill in the engine room workshop and while doing so he inadvertently operated the wrong handle and started the drill. The engineer was wearing gloves to
View AlertNumber: 15-21
Some of our vessels have been supplied with Thanner 4 Year Hydrostatic Release Units (HRU). A recent internal inspection on one of our vessels has highlighted that they have been fitted incorrectly. Therefore all vessels are requested to
View AlertNumber: 15-10
A fire broke out in the engine room onboard a PSV when she was on passage to an offshore location. The vessel was manned by 14 crew, fortunately there were no personal injuries sustained throughout this incident. The
View Alert