Number: 16-12
Platform Supply Vessel was set up on location and ready to deliver fuel; the hose was connected at the Starboard mid-ships connection. Pre bunkering check list complete. One AB was posted at port mid-ships manifold, one posted at
View AlertNumber: 16-03
At the start-up the pump for discharging of a cargo of Wet Bulk Waste (WBW) from the port side manifold to shore side tanks, there was a small spill from the ship’s starboard side discharge manifold. On seeing
View Alert