Number: 15-13
The vessel was engaged in a bulk transfer operation on the leeside of the platform. The incident involved a 2” bulk chemical transfer hose that had been passed up to the platform, and was being passed down to
View AlertNumber: 15-11
The vessel was performing operations at the leeside of the platform. The fuel hose was lowered by a bridle which is connected to the saddle fitted on the hose. The hose coupling was hanging loose. One of the
View Alert