Please note the following updates to the Guard Vessel Pre- Hire Inspection template
2.2 | Additional column – Now to include Medical Valid dates |
2.5 | Data Protection: Advise what measures are in place to control and protect the crew members’ personal information gathered at this inspection |
3.2 | Confirm the safety regime on-board for the use / wearing of Personal Flotation Devices (PFDs) and appropriate PPE |
3.6 | Additional comment – Personal floatation devices |
6.2 | Decks
Are decks and stairways in good state of repair and all are aware of slips, trips, and falls hazards? |
6.7 | Are all critical equipment and machinery being maintained as per manufacturer requirements?
Is there a defined and appropriate list of critical equipment? Note when was the last critical maintenance performed on critical equipment such as main engines/generators and if there is anything due during intended hire period |
6.10 | When was the vessel last slipped/major maintenance carried out/seacocks checked? |
8.1 | Testing for Satellite phones & Broadband added to comments column |
Issued: August 6, 2018
Guard Vessel Inspection